This weekend marks the final days of the 2016 trail build season and again, your club is reaching out to you for help. Over the next few days, we’ve got singletrack, berms, rollers and several more bridges to build, one of which will be a staggering 45 foot single span (man, we need some strong backs!) Much to our embarrassment, the response was so overwhelmingly positive on the last build weekend, we had trouble supplying enough tools to keep everyone busy. Please, if you’ve got a rake, shovel, loppers, bring them along.
Again, fatbikes are tools! Please bring out your fatbike to help get things packed in. Even if you’re just passing by on a Saturday spin, pop into the build site and ride over the trail.
When; Saturday, November 19th – 8:00am
Where; The Beaver Pond (at the bottom of the west fence line) and possibly at the barn to get bridges built.
Additional Times; Weekdays this week, until dusk, or as conditions permit.